Architect fee recovery is now a measurement problem rather than a negotiating one, and a 2026 survey of more than 230 UK practices shows how many firms cannot prove they are billing everything they earned.
More than a third of UK architecture practices are not confident they recover all the fees they are contractually owed[1]. That is not a pricing failure but a record-keeping one, and a second finding explains it: most practices still hold their financial record in spreadsheets, where unbilled work has nowhere to surface. Closing the gap starts with invoicing and fee tracking tied to agreed stages.
Quick answer
A 2026 survey of more than 230 UK practices found 36% were not very confident or not at all confident they recover all the fees they are entitled to, and only 17% found it easy to tell whether a project was profitable. Most still manage financial information in spreadsheets rather than dedicated software.
Key takeaways
- 36% of surveyed UK practices were not very confident or not at all confident they are recovering every fee they are entitled to.
- Only 17% said they generally found it easy to understand whether a project was profitable.
- 68% use spreadsheets for financial management and cost control, against 35% using dedicated project management software.
- 28% believe most of their projects run over budget or over the time originally allocated, and 32% of those overruns are caught only by a manual review.
- 78% expect to increase their investment in digital tools over the next two to three years, so the spending decision is already made.
What is the architect fee recovery gap?
Fee recovery is the share of the fee a practice is contractually owed for completed work that it actually invoices and collects. The architect fee recovery gap is the difference between those two numbers: work delivered against money banked. It is rarely one large write-off. It accumulates from unpriced variations, stages billed late, and hours nobody logged.
The 2026 survey shows the scale of that uncertainty. When 36% of practices cannot say with confidence that they have billed everything, the gap is not being managed, only discovered later.
Why it matters now
Only 17% of practices generally find it easy to understand whether a project is profitable[1]. Without that view, a fee that is quietly under-recovered looks identical to one delivered on plan until the year-end accounts arrive. Reading unbilled work in progress by stage turns an annual surprise into a monthly decision.
Where architect fee recovery leaks, finding by finding
Five linked findings each describe a place where earned fee income fails to reach an invoice.
1. A third of practices cannot confirm they have billed everything
36% of practices said they were not very confident or not at all confident they are recovering all the fees they are entitled to[1]. The survey covered more than 230 UK practices, published on 16 July 2026.
What this means for AEC firms: uncertainty of that size is a reporting gap, fixable without renegotiating a single fee.
2. Project profitability is invisible while it still matters
Just 17% of practices generally found it easy to understand whether a project was profitable[1]. The rest learn the answer after the fact.
What this means for AEC firms: a mid-project margin reading is the last point at which a drifting job can be corrected.
3. Spreadsheets still carry the financial record
68% of practices use spreadsheets for financial management and cost control, against 55% using accounting software and 35% using project management software[1]. For tracking time and costs against projects, 41% use spreadsheets, 28% project management software and 27% accounting software[1].
What this means for AEC firms: a spreadsheet records what someone remembers to type, so anything forgotten leaves no trace.
4. Overruns are found by hand, or late
28% of practices believe the majority of their projects end up over budget or over the time originally allocated, and in 32% of cases such overruns are only flagged by a manual review[1].
What this means for AEC firms: an overrun found by review surfaces too late to bill as an additional service.
5. The billable base is narrower than headcount suggests
RIBA's Business Benchmarking data for 2023 found that over 70% of the hours worked by architects, technologists and assistants were billable, falling to 64% for associates and 46% for partners, directors and sole principals[2]. In practices of 100 or more staff that share rose above 80%[2]. The same 2023 figures recorded an overall profit margin of just 2%, with revenue up 17% and staff costs up 14%[2].
What this means for AEC firms: at that margin, under-recovering a small share of billable hours consumes the whole profit.
The share of UK architecture practices managing financial information and cost control in spreadsheets rather than dedicated software, in a 2026 survey of more than 230 practices[1].
Key dates and measures
These findings come from two RIBA research programmes published three years apart, so it is worth being precise about which number comes from where. RIBA's benchmarking summary puts total revenue of Chartered Practices at an estimated £5 billion in its 2025 edition[3].
| Measure | What it shows | Research and date | Who it affects most |
|---|---|---|---|
| 36% not confident of full recovery | Practices unsure they bill every fee earned | RIBA Journal digitisation survey, 16 July 2026 | All chartered practices |
| 17% find profitability easy to read | Visibility of margin during delivery | RIBA Journal digitisation survey, 16 July 2026 | Project leads and practice finance |
| 68% manage finances in spreadsheets | Where the financial record actually sits | RIBA Journal digitisation survey, 16 July 2026 | Small and medium practices |
| Over 70% billable, 46% for partners | Billable share of hours worked by grade | RIBA Business Benchmarking Report 2023 | Resource planners and associates |
| £5 billion total practice revenue | Scale of the sector the gap applies to | RIBA Business Benchmarking 2025 summary | Anyone benchmarking a practice |
What does this mean for AEC firms?
The survey describes a condition, not a prescription, so the useful question is which habits change on Monday morning.
Bill against stages, not memory
Invoice points agreed at proposal stage give billing a trigger that does not depend on anyone noticing. A stage passed becomes an invoice raised, which removes the commonest cause of late billing.
Read margin while the job is live
With only 17% able to see profitability easily, a monthly reading is an advantage rather than housekeeping. A 20-person practice running eight projects can review all of them in an hour once the data sits in one place, and tools built for architecture practices make it routine.
Price the next fee from recorded hours
The 2023 benchmarking data showed billable shares varying from 46% to over 80% by grade and practice size. A fee built on assumed utilisation starts from the wrong number.
Benefits and challenges
Benefits
- Unbilled value becomes visible by stage, so invoices follow delivery rather than a reminder.
- Cost per hour is measured rather than estimated, making the next fee proposal defensible.
- Overruns surface from recorded hours instead of waiting on a manual review.
Challenges
- Accuracy still depends on staff entering time promptly, a habit question rather than a software one.
- Moving off spreadsheets means first agreeing one consistent list of projects and stages.
- Licence cost lands before any recovered fee, so the payback period needs a figure partners accept.
Common mistakes to avoid
Leaving billing to month-end recall
Fix: set invoice points in the fee proposal itself, then raise each invoice when its stage completes rather than when someone reviews the ledger.
Using a spreadsheet as the system of record
Fix: keep one authoritative record per project holding time, fees and variations together, so no number depends on a file someone forgot to update.
Buying software before fixing the process
Fix: define your stages, invoice points and rates first, then choose a tool that holds them, not the other way round.
Which tools close the architect fee recovery gap?
Closing the gap needs four things visible at once: hours by project, unbilled value by stage, cost per hour, and variations logged against the job. The cost of unrecorded hours usually settles the business case.
| What you need to see | Spreadsheets | Point tools | Quantim |
|---|---|---|---|
| Unbilled fee value by stage | Rebuilt by hand each month | Rarely included | Standing work in progress view |
| Billable share by grade | Possible, if timesheets are complete | Yes, in time-tracking tools | Reported against recorded time |
| Cost per hour behind a proposal | Depends who maintains the sheet | Partial | Derived from time and rates |
| Overruns without a manual review | No, review is the mechanism | Varies by tool | Forecast against actual by stage |
Everyone loves spreadsheets but there are a lot of risks associated with them. They aren't databases[1]Adrian Malleson, Head of Research, RIBA, in Practices unsure they are recovering all fees due, says digitisation survey
How Quantim helps
The finding that matters commercially is not that practices lack software. It is that delivered work and billed work live in different places, so nobody can reconcile them. Quantim closes that distance. Its timesheet formats capture hours against project and stage as the work happens, finance and reporting turns those hours into live project profitability, and built-in reports show unbilled value and realised margin without a collation exercise. Josh Probert-Waters of Hyphen Digital, interviewed for the survey, observed that work taking 10 hours a week could be cut to a couple of hours with the right tools[1].
- Record hours against stage, dailyCapture time where the work happens, so the hours behind a fee exist as data, not recollection.
- Reconcile delivered against billed, monthlyCompare work in progress by stage with the proposal's invoice points, and raise what is outstanding.
- Reprice from measured utilisationUse your own billable share and cost per hour to build the next proposal, not last year's figure.
Find out what you are not billing
Quantim has supported UK professional services firms for more than 23 years, runs on Microsoft Azure, includes over 200 built-in reports and comes with a 30-day free trial.
Request a demoPractice leader checklist
- Compare fee invoiced against hours recorded on three closed projects, to size your own architect fee recovery gap.
- Confirm every live project has written invoice points, and list any that do not.
- Check how additional instructions are logged, given 32% of overruns are caught only by manual review.
- Calculate billable share by grade and compare it with the 46% recorded for partners in 2023.
- Set a cost per person hour per grade and use it on your next fee proposal.
Frequently asked questions
Why do architecture practices struggle to recover their fees?
Because the record of work delivered and the record of work billed usually sit in different places. In the 2026 survey, 36% of practices were not confident they recover everything they are owed, and 68% keep financial management in spreadsheets. A spreadsheet only holds what somebody remembers to enter, so unbilled hours and unpriced variations leave no trace.
What share of UK architects use spreadsheets rather than software for billing?
For financial management and cost control, 68% of surveyed practices use spreadsheets, compared with 55% using accounting software and 35% using project management software. When tracking time and costs against individual projects, 41% rely on spreadsheets, 28% on project management software and 27% on accounting software. Many practices use more than one.
How can architects improve project profitability tracking?
Start by recording hours against project and stage rather than against the practice as a whole. Then compare that time against the fee at agreed invoice points each month. Only 17% of practices currently find profitability easy to read, and most of the difference comes from whether time data and fee data can be viewed together.
What causes budget and time overruns in architecture practices?
The survey found 28% of practices believe most of their projects run over budget or over the time originally allocated. The mechanism is usually late detection rather than poor planning: in 32% of cases an overrun is only flagged by a manual review, by which point the extra hours have been worked and cannot be renegotiated as an additional service.
Is project management software worth it for a small practice?
It depends on what you need it to do. RIBA's head of research has argued that practices need digitisation that fits the job rather than the largest available system. For a small practice the test is narrow: can you see unbilled value and cost per hour without rebuilding a spreadsheet. If not, the gap is costing real money.
Summary and next steps
The 2026 data describes a profession confident about its design work and uncertain about its billing. A third of practices cannot confirm full recovery, a sixth can read profitability easily, and two thirds keep the financial record in a spreadsheet. Fixing it needs no change in fee levels, only the delivered record and the billed record sitting close enough together that a shortfall shows up in a month.
- This weekReconcile one closed project's invoiced fee against its recorded hours, and write down the difference.
- This monthAdd written invoice points to every live project that lacks them, then bill any stage already delivered.
- This quarterMeasure billable share and cost per hour by grade, and use both to price your next three fee proposals.
Sources
This article is informed by the sources listed below. The analysis and recommendations are Quantim's own.
- RIBA Journal, Practices unsure they are recovering all fees due, says digitisation survey (16 July 2026). Accessed 16 November 2026.
- RIBA Journal, What can architects learn about billable work in the RIBA Business Benchmarking report? (7 December 2023). Accessed 16 November 2026.
- RIBA, RIBA Business Benchmarking 2025 summary (accessed 2026). Accessed 16 November 2026.
Further reading
- RIBA, RIBA Fee Calculator, which builds a fee from a resource profile and is available to RIBA Chartered Practices.
- Office for National Statistics, Construction industry statistics, for the output data behind practice workloads.
- RICS, Market Surveys and Economic Analysis, for quarterly readings on margins across the wider industry.
Related reading
Untracked Billable Time Is Costing UK AEC Firms
How much billable time firms actually capture, and why daily entry changes the number.
Revenue Up, Profits Down for UK Architects
Why practice revenue has grown while profit has not, read through benchmarking data.
5 KPIs Every UK Architecture Practice Should Track
The measures that show margin erosion early, including realisation and lock-up days.
Architect fee recovery improves the moment delivered work and billed work can be compared in one view. See how that works in practice on Quantim's approach to delivering profit, or arrange a walkthrough with the team.
